NPT Break Mastering NPT Reduction
Capture non-productive time where it happens, route every report through a governed review chain, and turn what the rig learned into an action the next well can actually use.
- 1 Supervisor raises
- 2 Engineer classifies
- 3 Team leader signs off
One platform for every drilling learning
Each module runs on the same governed review chain, so nothing ends up captured in a spreadsheet and forgotten.
NPT Incident Reports
Capture the event, the findings, the root cause and the preventive actions - with NPT hours and cost attached to every record.
HSE Flash
Circulate safety learnings across rigs the same day, with the recommendation and the intervention recorded against each event.
Cost Saving
Log and review savings initiatives by asset, team and quarter, so efficiency gains are evidenced rather than claimed.
Highlights
Record what went right. Successful campaigns and initiatives become repeatable practice for the next well.
New Technology
Track trials of new tools and techniques against the offset baseline, with the technical committee reviewing each one.
Rig Move & Delay
Break down every rig move into rig-down, transit, rig-up and NPT, and hold the pending points to close-out.
Observation Reports
Raise field observations with a recommendation attached, routed to the right engineer for action.
Analysis & Dashboards
Compare any two dimensions across the whole dataset - keyword, cause, rig, asset, country or severity.
A governed review chain
Every report moves through the same sequence. Each stage is stamped with who received it and when it was submitted, so the audit trail writes itself.
Drilling Supervisor
Raises the report from the rig with the event detail and initial observations.
Drilling Engineer
Classifies the NPT - owner, cause, sub-cause and severity - and adds the technical detail.
Senior Engineer
Reviews the root cause analysis and challenges the findings before they go further.
Specialist Engineer
Validates the preventive actions and confirms they are specific enough to act on.
Team Leader
Signs the report off. Completed reports feed the dashboards and the analysis page.
Technical Committee
Picks up escalated reports and marks the best ones for wider circulation.
Why teams run on it
NPT you can actually attribute
Hours and cost are recorded against an owner, a cause and a sub-cause, so the biggest contributors are visible instead of buried in a monthly summary.
Lessons that reach the next well
Learning points are flagged new or repeat. A repeat learning is the signal that a preventive action never landed.
Accountability at every stage
Received and submitted timestamps at each step turn the review chain into an audit trail without anyone maintaining one.
Field context, not just records
Reports carry rig, well, asset, section and coordinates, so patterns show up by formation and location rather than only by date.
Start cutting non-productive time
Bring your rigs, engineers and technical committee onto one governed workflow, and let the dashboards show where the hours are going.
Get started